Instructions / Assembly

TracRac
INSTRUCTION MANUAL
5
TracRac Inc. 994 Jefferson Street, Fall River, MA 02721-4893 • 508-677-4130
Roof Installation A:
Normal Installation
9. The lower edge of each Corner Bracket fits snugly into
the top corner of the van’s rain gutter. Place the J-Hooks
with Neoprene Strips around the outside edge of rain
gutter
(see Fig 3A)
.
CAUTION:
Re-torque all fasteners after first 100 miles to
adjust for settling. Recheck all torques every 3000 miles. Pro-
longed driving, vibrations may cause the fasteners to loosen.
• Roof Installation A: Normal Installation
• Roof Installation B: Gutter Span Installation
10. Center the Crossbars by measuring from the end of each
Corner Bracket, to the Crossbar ends, left and right.
11. Tighten the T-Bolts on the underside of the Crossbar to
240 in/lbs. (20 ft/lbs.) to secure the Corner Brackets to
the Crossbar.
12. Now tighten all Socket Head Cap Screws to 120 in/lbs.
(10 ft/lbs.) with the supplied Allen Wrench.
13. Reposition the Crossbar Tiedowns where desired. Now
you’re ready to go!
Capacity – The TracVan System is rated for a capacity of
500 lbs., evenly distributed over all racks, assuming normal
driving conditions and loading.
Do not exceed the racks’ rated capacity, as you could dam-
age the van’s rain gutter.
Secure loads carefully and exercise caution at all times.
We recommend using transverse ratchet straps to securely
tie down cargo.
Run additional ratchet straps around the front & rear of
loads, attaching them to the Crossbars to prevent any load
shifting during acceleration and stopping.
Figure 3A
VAN ROOF REAR VIEW
Corner bracket tab
Corner bracket
Rubber strip
Socket head cap screw
Lock washer
Neoprene strip
Crossbar
J-Hook clip