Installation Guide

Backyard Putting Green
Installation
1. Gather Tools You’ll Need
Hand Tamper
String Trimmer
Safety Glasses
2×4
3 Foot Level
Yard Rake (with flat metal side)
Leaf Rake
Square Nose
Shovel and Hand Trowel
2. Level the Site
Select a level site or create one by reading
“How to Level A Slopefor Putting Green
Installation” found under Instructions on
StarProGreens.com. Greens should not
be placed in a depression or drain way.
3.Roll out green &check grade
Use a level to make sure the grade
doesnot exceed a 2” rise over a 10’ run.
4. Outline edge of green with weed
eater, or edger
Always wear eye protection.

Summary of content (5 pages)