Installation Guide
9.Create a gentle raised crown in
the center for drainage
Use a leveling rake or 2×4 and rake the
areasmooth. No indentations should be
present.
10.Compact the base with a hand
tamper, gas tamper or roller
11.Check the base for levels and
smoothness
The 3/8” gravel holds contours much
better than sand, so contouring is best
done within the gravel base.
12.OPTIONAL: Additional paver
sand can be added
Paver sand adds smoothness or creates
gentle contours. Smooth with edge of
level to final desired contour.





