Installation Guide

13.Roll out green and check
smoothness and contours
14.Dig in cups with hand trowel or
4 ¼” hole cutter
OPTIONAL: If drainage is an issue, dig 2-4
inches deeper than the length of the cup
and add gravel. Top of the cup should be
1/8” below surface of the green.
15. Soil too hard to dig cups with a
hand trowel?
If digging is harddue to roots or
rocks,mark hole and roll up the green at
hole. Then, chop up the area by hole with
a pick or round nosed shovel. Compact
area flat and dig hole.
16.After the cup is set in the
ground, roll up green at hole and
compact soil around the cup with
the level