Installation Guide

D.I.Y. Peel-n-Stick
Installation & Warranty Guidelines
February 2016 Page 1
BEFORE YOU BEGIN INSTALLING FLOORING:
All instructions and recommendations are based on the most recent information available, for the latest version of
this guide please consult www.homedepot.com and search for your product SKU. These instructions should be
followed for an ideal installation.
Do not install over finished or pre-finished hardwood flooring, polyurethane or varnished finishes
Do not install over a sealed subfloor
Do not install over radiant heated floors that are maintained at temperatures greater than 85°F (29°C)
Do not install in exterior areas or where vinyl floors will be exposed to the elements
Do not install in garages or areas that will be damp
Do not install on below grade concrete
Do not install over unsuitable or unstable subflooring such as chipboard, OSB, luan plywood, mohagany-
based plywood underlayments, Masonite™, cement board, fiber-based backing boards, or any other non-
underlayment grade panel
Do not install over concrete that has been painted or contains any contaminants, grease, oil, solvents or
stains
NEVER use solvent-based or chemical floor preparation materials. Do not use primers or fillers that are
manufactured for use with paint or products other than vinyl flooring
Never use solvent-based or chemical care and maintenance products, refinishing products or waxes on
this vinyl flooring
READ AND FOLLOW ALL INSTRUCTIONS PRIOR TO INSTALLING…..Failure to do so will void product
warranty.
Accurate measurements and a flat, clean and DRY subfloor are essential for a successful installation. (self-
stick adhesives will not stick to dirt, dust or high-moisture content subfloors)
Flooring must acclimate for 48 hours prior to installation in the environment to be installed
Subfloor surface must be maintained at room temperature
Crawl spaces should be properly ventilated and have proper moisture barrier between the substrate and
subfloor
All concrete slabs should be tested for moisture content before installation
NEVER ADD ADDITIONAL ADHESIVE TO SELF-STICK TILES, REGARDLESS OF THE TYPE OF ADHESIVE!
SUBFLOORING
Install on interior residential floors, on or above grade only. Install over concrete, underlayment grade wood
panels, and properly prepared existing resilient flooring. Surfaces must be moisture free, clean smooth,
structurally sound, tightly secured, and flat and level. Existing hardwood flooring must be covered with a suitable
underlayment grade plywood panel as specified below; do not install self-stick products over finished (varnished or
polyurethane coated) hardwood flooring.
FOR CONCRETE
With a moisture test kit (not included) test for moisture in the slab. MVER must be 3 lbs./sq.ft./1000sq.ft. or less.
Remove all sealers, grease, oil, adhesive residue, dirt, paint, or other foreign material to ensure a clean bond. Use
of rubber mat test is not 100% reliable and may only be used as in indicator to conduct further testing.
FOR PLYWOOD
Panels shall be exterior underlayment grade, sanded face, properly installed and secured with 1/8” gap around the
perimeter of the room. Do not install over chipboard, OSB, luan plywood, mohagany-based plywood
underlayments, Masonite™, cement board, fiber-based backing boards, or any other non-underlayment grade
panels.
FOR EXISTING RESILIENT FLOORING
Existing floor coverings must be tightly secured and bonded. Remove any contaminants, waxes, sealers from the
surface and cover with a suitable cementitious embossing leveler. Do not cover loose-lay, floating flooring or
cushion backed vinyl with DIY Self-stick flooring.
TOOLS NEEDED:

Summary of content (7 pages)