Use Table 18 to verify that the circuits connected to the termination 
board on the termination module are wired correctly. Record test results 
in the “Actual value” column.
Table 18. Termination module post-installation checklist
Circuit
Mandatory
wiring
Te s t Actual value
24 Vac
TB1-1, 
TB1-2, 
TB1-3
9
Measure the voltage between TB1-1 and TB1-2. It must be 24 Vac 
nominal (19 Vac to 30 Vac).
Measure the voltage between TB1-1 and TB1-3. It must be approxi-
mately the same voltage as measured between TB1-1 and TB1-2
The ground wire must be connected to terminal TB-3. It must be 
tied to building or earth ground at nearest location. Measure the 
voltage between TB1-2 and TB1-3. It must be approximately 0 V. 
Alarm relay
TB1-4, 
TB1-5
Measure the voltage between TB1-4 and TB1-5. It must not exceed 
24 Vac. Jumper these two terminals. The user-supplied load should 
now be energized and active.
Priority 
shutdown
TB1-6, 
TB1-7
There must be no voltage applied to these terminals. These termi-
nals must be connected to dry contacts only. Measure the resis-
tance between TB1-6 and TB1-7. It must be approximately 0 Ω with 
the user-supplied contacts in the closed position, and infinity ohms 
with the contacts in the open position.
Meter input
TB1-8, 
TB1-9
There must be no voltage applied to these terminals. The terminals 
must be connected to dry contacts only. Measure the resistance 
between TB1-8 and TB1-9. It must be approximately 0 Ω with 
demand meter contacts in the closed position, and infinity ohms 
with the contacts in the open position. 
Thermistor
TB1-10, 
TB1-11, 
TB1-12
There must be no voltage applied to these terminals. The cable 
shield must be connected to terminal TB1-12. Measure the resis-
tance between TB1-10 and TB1-11. 
Note the approximate temperature at the location of the outdoor 
air temperature sensor. 
Compare the resistance and temperature values to the listed val-
ues in Table 19 on page 71. 
Comm
TB1-13, 
TB1-14, 
TB1-15
9
There must be no voltage applied to these terminals. Measure the 
resistance between TB1-13 and TB1-14. The resistance must be 
approximately 50 Ω with daisy-chained wiring. This test confirms 
the correct usage of the termination resistors as well as the conti-
nuity of the wire. 