Sequence of Operations
Single-Stage Control, Direct Spark
With power applied to the unit:
1. The thermostat calls for heat.
2. The power venter is energized and the pressure switch measures the flow through the vent
system and energizes the direct spark ignition system beginning the pre-purge timing when the
flow is correct.
Important: CAUTION: THE PRESSURE SWITCH MUST NOT BE BYPASSED. THE UNIT MUST
NOT BE FIRED UNLESS THE FLUE VENT FAN IS OPERATING. If this procedure is not
followed, there may be a gas buildup that could cause an explosion.
3. The direct spark ignition lights the main gas. The sensing device has seven seconds to prove
flame.
4. The fan time delay in the board allows the heater to come up to operating temperature. At this
time, the fan time delay relay closes and activates the fan motor.
1
5. The unit continues at full fire until the thermostat is satisfied and no longer calls for heat.
6. The main valve closes.
7. The fan time delay relay remains closed, keeping the fan operating to dissipate residual heat
from the heat exchanger. At this time, the fan time delay relay opens and deactivates the fan
motor.
1
See “Fan Control,” p. 30.
• Caution - Disconnect power before
servicing.
• Unit must be grounded.
• Use copper conductors only.
• If any of the original wire as supplied
with the appliance must be replaced,
it must be replaced with wiring
material having a temperature rating
of at least 125°C.
• High-limit wires minimum 200°C.
• Refer to installation instructions for
venting, gas piping and start-up
procedures.
• - - - Indicates Field Wiring.
• ___ Indicates Factory Wiring.