Installation and Maintenance Manual

RTAC Start-Up Test Log Revised: 28 Jan2014
RTAC Start-UpTest Log
RTAC START-UP TEST LOG
Model #
Job Name Job Location
CRC # Serial #
Sales Order # Ship Date
Job Elevation (ft.
above sea level)
Starter Data: Start-up Only
Manufacturer Chiller Appearance on arrival:
Type: (wye-delta or x-line) Machine gauge pressure: ckt1/ckt2
Vendor ID #/ Model #: Machine CH.530 pressure ckt1/ckt2
Volts Amps Hz Unit R-134a Charge lbs
Compressor Data:
Unit oil charge (OIL00048) gal
Compressor A:
Pressure Test (if required)
Model #: Vacuum after leak test= mm
Serial # Standing Vacuum test= mm rise in hrs
RLA
Current Transformers
KW Part number ("X" code and 2-digit extension)
Volts X
HZ X
Compressor B: X
Model #: X
Serial # X
RLA X
KW
Summary of Options Installed
Volts Y N Tracer Communications Interface
HZ Y N Ice Making
Compressor C: Y N Other
Model #: Y N Other
Serial # Y N Other
RLA
Evap Design Conditions
KW GPM PSID
Volts Entering Water: Leaving Water:
HZ % Glycol:
Compressor D: Type of Glycol:
Model #:
Evap Actual Conditions
Serial # GPM PSID
RLA Entering Water: Leaving Water:
KW % Glycol:
Volts Type of Glycol:
HZ
Owner Witness Signature: