Owner's manual

1 - 2
T/AV Averaging Temperature Sensor Installation Instructions 19-2511 Issue 3 27/06/08
T/AV Installation Instructions
/S 6 off
/L 12 off
INSTALLATION (continued)
Mount on sensor on duct
3
a
b
Drill hole in duct
Drill 2 holes
2 off
Mount sensor tube in duct
4
42.5mm (1.67”)
•Ø 7mm (0.28”)
Remove lid and lift up board
5
85mm (3.35”)
d
c Uncoil sensor tube and feed into duct
R< 10cm (3.94”)
clips
a
b
c