Installation Guide

Installation Guide
www.trendingaccessibility.com info@trendingaccessibility.com
8
for fusion shower pan on wood joists
Step 18 > > > > > > > >
Just like you applied the corner pieces, use your
cut strips of Crack Insulation Tape to cover all the
seams. Again, trowel or paint liquid waterproofing
onto seam, press tape into position and coat
the top to seal. Make sure to fully cover both
sides of the crack isolation tape with the liquid
waterproofing product. To make this process more
manageable, it is best to work in two foot sections.
NOTE:
Illustration just shows tape use.
Please apply liquid waterproof-
ing to the wall and tape before
applying.
Step 17 > > > > > > > >
Using the 5” crack isolation tape provided, cut
strips of tape to length, to cover all seams (Corner
seams, wall/floor seams, pan/floor joint). Put
pieces aside.
If you are creating full wet room, you will need to tape
any seams throughout the entire room.
If you are only waterproofing the shower zone, you
will only need to tape the seams up to 2 feet outside
the shower area.
Step 19> > > > > > > >
Using the 5” crack isolation tape. Overlap all seams
of cement board used on either the floors or walls.
Overlap the seam where the Fusion pan and cement
board meet.
Make sure the tape
overlaps the seams
equally.
Extend the tape
2 feet past the
shower pan
2 feet
Step 20 > > > > > > >
Using the provided precut piece of gasket
membrane, slather area where gasket piece
will adhered to the drain area. Place over drain
adapter flange, making sure to cover all screw
holes, and securely press down into flange. Coat
top of gasket piece with liquid waterproofing.
Important: Remember to remove the clamping
ring prior to placing drain gasket.
Gasket Clamp
Drain Adapter Flange
Gasket
Membrane