Installation Guide

Installation Guide
www.trendingaccessibility.com info@trendingaccessibility.com
4
for adjustable fusion shower pan on wood joists
Step 1 > > > > > > > >
For optimal performance, it is imperative there is
a level surface prior to installation of new Fusion
pan. Check existing floor to make sure it is level. If
it is not, please correct prior to installation.
Step 2 > > > > > > > >
Place the Fusion pan in desired location and mark
the edge of the pan on the subfloor.
Note: If the Adjustable Fusion Pan needs to be
trimmed, follow the guidlines on page 12.
Step 3 > > > > > > > >
Carefully cut along your line as accurately as
possible. Make sure to adjust the depth of your
saw to the thickness of the subfloor as to not
cut through the joists. Note: If possible, please
check or mark location of existing plumbing and
electrical to avoid damaging them.
Step 4 > > > > > > > >
Remove the cut section of subfloor to expose the
joists.
subfloor
Joists must be 16”
on center
If you need to cut the
pan to fit into a cus-
tom location, please
refer to the cutting
and drilling guidline
on page 12 for de
-
tailed directions