Installation Guide

Installation Guide
www.trendingaccessibility.com info@trendingaccessibility.com
8
for adjustable fusion shower pan on wood joists
Step 17 > > > > > > > >
Make your final connections to the drain. First
apply a bead of caulk (
Recommended: DAP
Dynaflex 230)
to the underside of the strainer body.
Pass the strainer through the drain adapter flange,
and tighten. Make sure connection is snug but do
not over tighten.
Step 19> > > > > > > >
Begin taping the wetroom floor at the interior corners
of the Fusion Pan using the corner pieces of the
crack isolation tape provided. Using a paint brush or
trowel, slather liquid waterproofing into corner, press
piece into place, then apply liquid waterproofing on
top. Make sure to smooth out any creases. Repeat for
additional corners.
Step 18 > > > > > > > >
You will now begin waterproofing the wet room.
BEST PRACTICE: To achieve the best results, we
recommend waterproofing the whole room.
Minimum requirements, shown in these
instructions, show you that you only have to
waterproof the shower zone, which is 6 ½ feet high
and about 2 feet outside of the showering area.
Materials needed for wet room waterproofing.
Step 20 > > > > > > >
Using the 5” crack isolation tape provided, cut
strips of tape to length, to cover all seams (Corner
seams, wall/floor seams, pan/floor joint). Put
pieces aside.
If you are creating full wet room, you will need to tape
any seams throughout the entire room.
If you are only waterproofing the shower zone, you
will only need to tape the seams up to 2 feet outside
the shower area.