Step 22> > > > > > > >
Apply two coats of liquid waterproofing in op-
posing directions to achieve 40 mils. (roughly the
thickness of a credit card)
BEST PRACTICE:
To achieve the best
results, we recommend
waterproofing the
whole room.
Step 21 > > > > > > > >
Begin the application of the liquid waterproofing
membrane. Paint a layer of liquid waterproofing over
all taped joints. It is easiest to begin with the walls
first and then proceed to the floor area. For con-
sistant application, use a paint roller to apply water-
proofing to all surfaces. Allow the waterproofing to
dry for about 4 hours. After first coat is dry, re-coat in
the opposite direction. If you rolled up and down for
the first coat, roll left to right on the second coat.
Best Practice > > > > >
To achieve the best results, we recommend water-
proofing the whole room.
The waterproofing must cure for at least 12 hours
before flood testing.
If flood testing, perform test before tiling.
Use modified thinset when placing the tile.
Step 23a > > > > > > >
To use the tile edging strips, first position them
around the perimeter of the drain.