Instructions / Assembly

10/1/2012
4
STEP 2:
Unpack the Door Unit
Remove the door frame from the packaging, being careful not to damage the frame or paint finish.
Clean and inspect the frame. Please dispose of all packaging material responsibly and always recycle when
possible.
Store the frame on a clean flat floor surface covered with a heavy grade panel or finish with scissors or a
utility knife.
Clean and inspect the door panel and glass frame. Please keep the packaging material help protect the door
from job site damage while construction continues. When disposing of any packaging material please be
responsible and always recycle when possible.
Remove the glass frame from the door panel and store the glass frame on a clean flat floor surface covered
with a heavy grade drop cloth until this part is needed for installation. Open the glass frame 90 degrees and lift
upwards to remove the glass frame from the door panel. You will need at least 2 people to lift and remove the
glass frame from the door panel.
Store the door panel on a clean flat floor surface covered with a heavy grade drop cloth until the part is
needed for installation.
Recheck the rough opening and confirm all rough opening and unit measurements are correct and the rough
opening is plum and level. Install three 3/8 caulk beads along the length of the sill and 6 up each stud.
Caution please use an exterior grade caulk designed for window and door weatherproofing.
STEP 3:
STEP 4:
Install door frame into the rough opening, center the door frame in the rough opening and align with the interior
or exterior finish wall surface . Place one temporary # 14 3 screw at each hinge location.