Instructions / Assembly

10/1/2012
6
STEP 5:
Check the threshold for level and adjust as necessary. The threshold must be installed level in order to assure
the proper operation of the finished door unit. When the threshold has been leveled please do not walk or
place any weight on to the threshold until the caulk has fully set.
Reinstall the door panel onto the frame. Using a 3-in-1 oil, lightly coat the hinge pins and install into the hinge
knuckles located on the door frame. To install door panel lift the door panel and lower the door hinges onto
the frame hinge pins. You may find it easier to hold the door panel at a 90 degree angle and have one person
align the hinge pins and at least two people to lift and lower the door panel into place> Repeat for each door
panel.
STEP 7:
STEP 8:
With all the door panels installed please check the door unit for proper operation and alignment. Adjust any
install screw or shims to maintain the correct operation and alignment of each door panel. Check and retighten
all install screw locations as necessary.
STEP 6:
Place shims at each hinge location and adjust the frame until it is level and plum. Continue to place shims and
# 14 3 screws at each predrilled screw location. When all install screws have been installed please recheck
for level and plum and tighten all install screws.