Instructions / Assembly
7/9/2012 
3 
STEP 1: 
Check and Prepare Rough Opening for the installation of door unit. 
 Measure rough opening to confirm the rough opening 
is the correct size. 
 The rough  opening width must  be 1”  larger than the 
overall  door  frame  width,  the  rough  opening  height 
must be ½” taller then the overall height of the complete 
door frame including the threshold. (WARNING) A larger 
than  required  rough  opening  will  weaken  the  door 
installation  and  may  cause  personal  injury,  property 
damage or product failure. 
 The  sill  must  be  level  and  clean  to  install  the  door, 
check the sub floor or slab foundation to make sure it is 
level.  DO  NOT  PROCEED  to  the  next  step  until  the 
door  unit  can  be  installed  onto  a  clean  and  level 
surface.  Scrape  sand  or  fill  the  sub  floor  or  slab 
foundation  with  the  appropriate  material  to  insure  a 
clean and level sill. 
 Check  all  framing  to  and  make  sure  that  the  frame 
work  is  secure  and  will  support  the  weight  of  the 
iron/steel door unit. 
 Check the rough opening for plum and level using the 
6 and 3 foot level. The rough opening must be plum and 
level to  install this door unit. Make any adjustments 
needed  to  insure  that  the  rough  opening  is  plum  and 
level. 
 WARNING  to  avoid  the  potential  for  electrical  shock 
please make sure all electrical  wiring next to the door 
unit is installed to code and will not allow any exposed 
electrical wire, to contact the door or frame. 