Installation Guide

INSTRUCTIONS
STEP 1
»
Clean the joist surface
making sure it is dry
and free of any debris.
STEP 2
» Remove the backing
while applying the tape
directly to the surface.
Run your hand over the
tape and firmly press it
on to the joists.
STEP 3
» After covering the joists
and beams with tape,
cut the tape to length
with a utility knife
or scissors.
TREX JOIST & BEAM TAPE INSTALLATION
PREPARATION
» Trex Protect Joist & Beam Tape
can be applied to horizontal
and vertical surfaces including
all joists, rim joists, beams, steps,
stair stringers, blocking, ledger
board, under joists hangers
and other surfaces.
» Trex Protect Tape has two widths
making it convenient to apply to
double beams and joists.
Use 1–5/8” (4.13 cm) Joist Tape
for joists and 3–1/8” (7.94 cm)
Beam Tape on all double joists
and beams.
» For best results, the Trex Protect
Tape should be installed when
temperatures are 50˚F (10˚C)
or greater.
» If installing in cold weather or
when joists are wet, staple Trex
Protect to hold it in place while
attaching the deck boards. The
tape will seal when the product
warms above 50˚F (10˚C).
» When pulling deck boards onto the
deck, a piece of plywood or wafer
board can be used to overhang the
edge of the deck. This will prevent
the product from rolling up and
pulling up from the joist.
JOIST & BEAM TAPE
For more information, visit www.trexprotect.com
© 2021 Trex Company, Inc. All rights reserved. Trex® RainEscape® products are manufactured and sold by IBP, LLC under
a Trademark License Agreement with Trex Company, Inc. RainEscape® is a federally registered trademark of IBP, LLC.
NOTE:
Trex Protect cannot be used when installing Trex RainEscape.

Summary of content (1 pages)