Installation Guide

17
18. MODIFIED DOWNSPOUTS
»
For odd joist spacing you must
modify the downspout.
»
Tear or cut out the front opening.
»
Cut through the back of the downspout
halfway down, so that downspout fits bay opening.
»
Adjust the downspout to fit in the bay and
staple to secure.
»
Finish by taping the seam from top to bottom.
CUT DOWNSPOUT
THROUGH THE BACK
TOP TO BOTTOM
ADJUST SIZE AND STAPLE
TO THE BACK OF THE BAY
IF USING 12 & 16 O.C. FUNNELS,
MAKE SURE TO ALIGN DOWNSPOUTS
TAPE SEAM
TOP TO BOTTOM
18
RUN A BEAD OF BUTYL CAULK
BETWEEN JOISTS/BEAMS
FINISH BY TAPING
OVER ENTIRE JOIST/
BEAM AND TROUGH
TO ENSURE PROPER
SEALING WHEN
ATTACHING
DECKING
17. INSTALLING A TROUGH OVER A
DOUBLE OR TRIPLE JOIST/BEAM
»
Caulk between each joist/beam to
ensure a water tight seal between
the joists/beams.
»
Cover the top of the joist/beam with the trough material
that overlaps into both adjacent bays. Tape seams
and
trough material where screw penetration may occur.
»
Tape over the top of the triple joist/beam and trough
material that sits on top of the joist/beam.
NOTE:
All wood must be covered with trough material
and taped wherever decking will be screwed.
If installing a post in this location, consult with the local
building code ocial prior to installation to ensure
all code and safety requirements are met.
17
TROUGH
TROUGH
TROUGH
INSTALL ENOUGH TROUGH
MATERIAL TO COVER THE TRIPLE
JOIST/BEAM AND EXTEND AT LEAST
2" INTO THE ADJOINING TROUGHS.
TAPE THE SEAMS OF THE TROUGH
MATERIAL TOGETHER
MODIFICATIONS & SPECIAL CASES
DOWNSPOUT
DOWNSPOUT
SECOND STORY GUTTER DUMPS INTO FUNNEL
TROUGH FLOW
TROUGH FLOW
16A
16B
16. DRAINING SECOND
STORY GUTTER
ON DECK
»
Block out a 12" x 16" o.c. rectangle
where the second story gutter
discharges onto the deck. (16B)
»
Place downspout in rectangle
(do not remove openings).
»
Tape downspout in place.
SCAN FOR VIDEO
SCAN FOR VIDEO
SCAN FOR VIDEO