Installation Guide
6
BASIC INSTALLATION
3. INSTALLING THE TREX
RAINESCAPE TROUGHS
NOTE: If installing when temperatures
fluctuate drastically, be sure to acclimate
trough material before installing.
Especially if you are using black.
Here are two ways.
»
Unroll trough material, giving plastic time to relax
and acclimate to outdoor temperatures.
»
Roll trough material back up, smooth/shiny side
in to ease install.
»
When working with the Trex RainEscape trough
material, ensure that the smooth/shiny side
always faces up.
1-1/2" 4" CUT LINE
3B
3A
UNROLL USING
1
1
/2" SCORE MARK
ON INSIDE OF
JOIST AS A GUIDE
SLIDE TROUGH OVER THE
TOP OF THE LEDGER
PLACE FIRST STAPLE
ROLL
UNROLL TO THE DOWNSPOUT
SMOOTH/SHINY SIDE FACES UP
3C
»
If installing the system on 12" o.c. joist, cut the
1 - 1/2" score mark side back 4". Then align the left
edge of the trough with the outside of the joist. (3A)
»
Apply a bead of caulk along the ledger board.
»
Hold roll so 1 -
1/2"
score mark is on the left. (3C)
»
Line up the 1 -
1/2"
score with the left joist.
»
Place first staple at ledger board on 1 -
1/2"
score
mark side. (3D)
1
2
3
4
PLACE 3RD STAPLE THROUGH
TROUGH AND DOWNSPOUT
PLACE FIRST
STAPLE
AT LEDGER
PLACE 2/3
STAPLE AT HALF-
WAY POINT OF
THE DOWNSPOUT
FINISH STAPLING EVERY
12" TO 16" GOING FROM
SIDE-TO-SIDE" UNTIL YOU
REACH THE LEDGER
3D
SCAN FOR VIDEO
BASIC INSTALLATION