Installation Guide

19
MAKING CONNECTIONS
1. Install splitters to inside of framing using hardware
provided. Install a splitter at every junction where
you will run a row of lights.
2. Run wire through joist and roll up 1' - 2' (0.30 m -
0.60 m) extra wire in area the light will be installed.
Staple to the side of the joist (making sure
not to staple through the wire).
3. Cap o all unused female connections on splitters
using caps provided or weather resistant silicone.
EXAMPLE OF A 2 ROW LIGHT INSTALLATION
FOR JOISTS BETWEEN 9' AND 12' (2.76 - 3.65 M)
EXAMPLE OF A 3 ROW LIGHT INSTALLATION
FOR JOISTS BETWEEN 13' AND 16' (3.96 - 4.87 M)
2
2
3
1
6"
(15.2 cm)
Post
Post
Sleeve
1
2
1
2
GFCI
Outlet
Timer
TREX Transformer
To Splitter
Dimmer
(Optional)
6"
(15.2 cm)
1
2
Light
connection
Connection
wire
Connection wire
2
2
3
1
6"
(15.2 cm)
Post
Post
Sleeve
1
2
1
2
GFCI
Outlet
Timer
TREX Transformer
To Splitter
Dimmer
(Optional)
6"
(15.2 cm)
1
2
Light
connection
Connection
wire
Connection wire
2
2
3
1
6"
(15.2 cm)
Post
Post
Sleeve
1
2
1
2
GFCI
Outlet
Timer
TREX Transformer
To Splitter
Dimmer
(Optional)
6"
(15.2 cm)
1
2
Light
connection
Connection
wire
Connection wire
1
2
3
Joist Length
Deck Width
House
9’ - 12’
13’ - 16’
= SPLITTER
= LIGHT
8’ (2.44 m)
or less
9'- 12'
(2.76 -
3.65 m)
13' - 16'
(3.96 -
4.87 m)
INSTALLING THE LIGHTS
» Install ceiling of your choice. Make sure to
remember where wire end is located.
» Mark where the light is to be installed and use
4-5/8" or 120 mm hole saw to bore hole,
(a jig saw can be used instead of a hole saw).
» Reach up through the hole and pull out wire end
and attach to light.
» Fold orange springs up and push light into opening.
The springs will fold down and hold light in place.
» If using directional feature, spin light so it
shines on desired area.
SOFFIT LIGHT