Installation Guide
51
HOW TO INSTALL DECKING
COMPOSITE POST APPLICATIONS
Installation of Guide Blocks and Railing
NOTE: Pre-drilling is not required but is optional for 
attachment of guide blocks to post. Use a drill bit slightly 
smaller in size than that of screw being installed.
6.   Place or rest bottom aluminum guide block on 
bottom of post. Place guide on post so that notch is 
on a side that does not require railing to be attached.
7.   Attach bottom guide block using one 10 x 1” self-
tapping screw (provided) in notch to lock guide block 
onto post.
8.    Location of top guide block will vary slightly based on 
type and height of railing being installed. Determine 
this measurement and place top guide block in 
location where top bracket for desired railing would 
be approximately on center of the top railing bracket 
location.
9. Attach top guide block using one 10 x 1” self-tapping 
screw (provided) in notch to lock guide block onto 
post. 
» If using the joist mount post with composite post 
sleeve, quantity of 18 self-tapping screws are provided 
to cover all types of Trex railing bracket installations 
(Transcend, Signature, and Select). Thus depending 
on the type railing being installed, you may have 
screws that are not used.
»  If using 6x6 post sleeves, attach designated railing 
brackets using #8-15 x 1-3/4" (4.4 cm) 316 stainless 
steel self-tapping screws (
not provided
).
»   Pre-drilling is not required but is optional for 
attachment of brackets to guide blocks. Use a drill 
bit slightly smaller in size than that of screw being 
installed.
SIGNATURE (FORMERLY REVEAL)
POST APPLICATIONS 
Installation of Railing
1. All required hardware is included with Signature 
railing, follow Signature railing instructions for 
complete installation requirements.
1
notch
3
notch
2
4










