ide:
each line by dividing the length f each line in inches by 96. nd any remainder .
* For standard single gates: (1) small Trex gate panel, (1) steel post insert, and (1) Trex single gate hardware kit. * For standard double gates: (2) large Trex gate panels, (2) steel gate post inserts, and (1) Trex double gate hardware kit. T Bef re y Needed Stakes Circ lar Saw String Line Drill Marking Paint Pencil Hammer Wheelbarr w Ta e Meas re 4’ Level Sh vel 12” Miter Saw P st H le Digger S eed Sq are Digging Bar inish N y n begin dig.
E ed View B D C E A C C A. 1 P st B. 1 P st C. 4 D. 1 T ckets F Rail E. 19 Pickets .
St 1. S M 1: Determine Install Met d: This meth d grad ally “ste s” the sl e and the rails remain level. This may leave ga s nder the fence. The d nhill st will need t be set taller. nger sts may be req ired. When laying t the fence st s acing, meas re n a level line an ther. 2. ll wing the ne st t de: This meth d f ll s the grade r sl e with the rails arallel t the . The st acing gr may need t be red ced t av id rails being t sh rt beca se f the angle. 3. The fence can di rent height.
St 2: Stake and String ins s that stakes will n t be d rbed when digging h les, and r x. r erty ns t ins re n encr aching n neighb rs. 4-5 inches inside 2. string every 96” in fr m the string t mark center f h N tes: Laying t 2” sts 96” 96” centers. o 90.2” (68 x 12” = 812” / 9 = 90.2” ) n center. ig.
St 1. 3: Dig es Dig stakes the the the string. The string may be and are be 12” diameter and 30” be that they all sides ( ee ig. 2) 4: Set 1. mb and level each st t the string line 4’ level* that the are next string line. with brace if necessary dry 24. I changes) set the height begin This line is lled set line is lled t kee the in line. all end, ere grade be 74 1/2” inches high**. String a line the the string. (see ig.
St 5: P sts 1. set ark all end, height at 74 1/2”* ** grade and string a line these ( ig. ) ark and height the a . string Reve l If greater reve l is desired increase height.
Using 1 5/8” fence screws, the brackets a bracket* 5 3/4” the the a the bracket 73 5/8” ** 5 3/4 “ (see ig. ) If the fence a brackets the be that the rails 73 5/8” 74 1/2” angles angle ada t rs with the fence brackets. Each a 22.
Mark the length by rail, them next the the the rail rail with a 1/2” scratching the tance between is 91” the and rail and ig. ) metal rail will blade. rail If the disbe with miter saw 4. 5.
St 8: Install Pickets Insert the at 8’ the center, the it the and last the they rail, and rail, their 1 ) If the last t may be easier last and reinsert it by sliding it is the (see ig.
St 9: Install T end and fence bracket the R by at the rail the rail the fence 1 5/8” brackets screws the rail 1 ) at each end (see the third the last screws (see (see ig 1 ).
3 . venly the last (see ig. 1 ) and it the rails 4.
Tre s (all heights) 14
TM Care And Maintenance Dirt and Debris Clean fence needed dirt and water and a are all that Water s, Leaf Staining and W d Tannins Sc s & Abras ns R st Stains, nd-In Dirt and rime and Pigment Staining Oil and grease Stains M d & Mildew Pre re Washer Sanding Dis sal Tre m any es n t rec mmend sanding. Sanding will change the a s rface f Trex Material and will void the warranty. earance f the Do not burn Trex d cts.
012419