Instructions / Assembly

7
St 3: Dig es
I height begin all end, ere grade
changes) be 74 1/2” inches high**. String a line the
set the the string. (see ig. 4)
4: Set
1. mb and level each st t the string line
4’ level* that
the
are next string
line.
with brace if
necessary
dry 24-
.
1. Dig the the
stakes
the string. The string may be and
are be 12”
diameter and 30”
be that they
all sides (
ee ig. 2)
This line is lled
set line
is lled t kee the
in line.
7