Installation Guide

39
HOW TO INSTALL DECKING
Universal Fasteners
1. Remove screws from fasteners on both sides of
board to be replaced and remove board.
2. Angle new board to place. See inset box (above).
HOW TO REPLACE TREX
®
BOARDS
INSTALLED WITH STAINLESS STEEL (TREX TRANSCEND
®
, ENHANCE
®
, AND ACCENTS
®
)
Stainless Steel Fasteners
1. Mark the board to be replaced in thirds. Cut each
side of middle section and remove it. Remove
remaining two sections.
2. Hammer down the exposed side of the connector
clips. Place the new board into position using a
pry bar to maneuver it into place. Secure board
on grooved edge with finish nails, screws or use
counter drill, screws and plugs.
2
1
1
2
New board at an angle
Existing Deck
3
4
4
1
1
3
2
2
2
3
1
HOW TO INSTALL ESCAPES
®
BOARDS
WITH TREX HIDEAWAY
®
UNIVERSAL FASTENERS
1. Follow steps 1 and 2
for installing start clips
and first board. See
page 38.
2. At both ends and
center of first board,
toenail screw (provided
with Escapes universal
hidden fasteners), at
an angle through grooved edge of deck board.
3. Follow steps 3-5 for installing universal fasteners.
See page 38.
4. For every consecutive board installed, toenail screw
at an angle through grooved edge of deckboard as
stated in Step 2.
5. Follow remaining steps for completing installation
and installing last board. See page 38.
HOW TO REPLACE TREX
®
BOARDS
INSTALLED WITH TREX HIDEAWAY
®
UNIVERSAL FASTENERS
(TREX TRANSCEND
®
, ENHANCE
®
, ESCAPES
®
, AND ACCENTS
®
)