Installation Guide
79
SELECT RAILING
Read all instructions BEFORE installation.
NOTE: Foot blocks must be placed before
installing bottom rails.
NOTE: One centered foot block is required for
every section of railing or stairway section.
Attaching Foot Block to Bottom Rail
1a. Center and cut bottom rail to fit between post span,
making sure to cut from both sides of bottom railing
to allow for balusters to be equally spaced.
1b. Invert the Select bottom rail.
1c. Center foot block on Select bottom rail. Drill 1/16"
(0.15 cm) pilot hole through center of rail, then
attach foot block to rail using 2" (5.1cm) screw
(provided). DO NOT extend foot block.
Drill Pilot Hole for Foot Block Base Plate
2. Center bottom railing with foot block attached (DO
NOT EXTEND FOOT BLOCK) in between post
span. Place base place directly under location of
foot block placement and mark accordingly.
Installing Foot Block Base Plate
3. Remove rail. Position foot block base
plate at marked locations and drill a
1/16" (0.15cm) pilot hole into deck
board. SECURE foot block base plate
with #10 x 3/4" (1.9 cm) stainless steel
screws (provided).
Installing Select Railing Section
4. Install Select horizontal railing section as per
instructions provided with Select Railing.
HOW TO INSTALL TREX
®
SELECT™ RAILING FOOT BLOCKS
TREX SELECT™
1
1
3
2
Center
Line
2
1b
1
1c
2
1
1
1a
3"
(7.6 cm)
3"
(7.6 cm)