Instinct Installation Manual

Table Of Contents
CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS
3
WARNING
1.5.
Recommended Clearances
The INSTINCT is approved for zero clearance to com-
bustibles
,
ex
cluding
v
ent
and
boiler
piping
.
Boiler piping must be a minimum 1/4 inch from
combustible materials.
Reference the INSTINCT Vent Supplement for
vent pipe clearance requirements.
1.6.
Residential Garage Installations
When installing the INSTINCT in a residential garage,
the following special precautions per NFPA 54/ANSI
Z223.1 must be taken:
Mount the unit a minimum 18 inches [458 mm]
above the floor level of the garage. Ensure the
burner and ignition devices / controls are no less
than 18 inches [458 mm] above the floor level.
Locate or protect the unit in a manner so it
cannot be damaged by a moving vehicle.
NOTICE
When maintaining less than recommended
service clearances, some product labeling,
including the rating label, may become hidden
and unreadable.
If the recommended clearances listed above
cannot be maintained or the enclosure in
which the boiler is installed is less than 70
cubic feet, the space must be ventilated.
See Section 2.2 on page 6.
When installing the INSTINCT in a confined
space, sufficient air must be provided to
allow, under normal operating conditions,
proper air flow around the product to
maintain ambient temperatures within
safe limits to comply with the National Fuel
Gas Code (NFPA 54 / ANSI Z223.1)
Failure to comply with these instructions
can result in substantial property
damage, serious injury, or death.
BEST PRACTICE
It is recommended that the following clearances
be maintained for serviceability:
Top boiler jacket - 24 inches [610 mm].
Front - 24 inches [610 mm].
Bottom boiler piping - 24 inches [610 mm].
Rear - 0 inches
Sides - 6 inches [153 mm]