Prestige Solo Series Installation Manual
v
TABLE OF CONTENTS
CHAPTER 10 - START-UP PREPARATION ........................................................................53
10.1.  Boiler System Fluid Requirements ............................................................................................. 53
10.1.1  Boiler Fluid pH Level 6.0 to 8.0 ..........................................................................................53
10.1.2  Boiler Fluid Hardness Less Than 7 Grains .........................................................................53
10.1.3  Chlorinated Water ...............................................................................................................53
10.1.4  Flush Boiler to Remove Sediment ......................................................................................53
10.1.5  Cleaning of Old Boiler/System:  .........................................................................................53
10.1.6  Cleaning of New Boiler/System:  .......................................................................................53
10.1.7  Check and Test Antifreeze ................................................................................................. 54
10.1.8  Use of Antifreeze in the Boiler System ............................................................................. 54
10.2.  Filling the Boiler System .............................................................................................................. 54
10.3.  Check Low Water Cut-Off Device ................................................................................................ 54
10.4.  Check For Gas Leaks ................................................................................................................... 55
10.5.  Check Thermostat Circuit ........................................................................................................... 55
10.6.  Inspect Condensate Drain Assembly ......................................................................................... 55
CHAPTER 11 - START-UP PROCEDURES ......................................................................... 57
11.1.  Final Checks Before Start-Up .......................................................................................................57
11.2.  PRESTIGE Solo Start-Up ..............................................................................................................57
11.3.  Check the PRESTIGE Solo and System .......................................................................................57
11.3.1  Check Boiler Piping. ............................................................................................................57
11.3.2  Check Vent and Combustion Air Piping.............................................................................57
11.3.3  Verify Carbon Monoxide Detector .....................................................................................57
11.3.4  Check Gas Piping ................................................................................................................ 58
11.3.5  Verify Flame Pattern and Combustion ............................................................................. 58
11.3.6  Measure Input - Natural Gas Only ......................................................................................59
11.3.7  Test High Temperature Limit ..............................................................................................59
CHAPTER 12 - OUTDOOR RESET CONTROL ................................................................... 61
12.1.  Mounting the Outdoor Sensor .....................................................................................................61
12.2.  Wiring the Sensor ..........................................................................................................................61
CHAPTER 13 - EXTERNAL MODULATING CONTROL .....................................................63
13.1.  Wiring the Modulating Controller ................................................................................................ 63
13.2.  ACVMax Programming ................................................................................................................ 63
13.3.  Programming of External Modulating Control........................................................................... 63
CHAPTER 14 - CHECK-OUT PROCEDURES .....................................................................65
CHAPTER 15 - INSTALLATION RECORD ..........................................................................67










