PVC, CPVC, PP & SS Vent Supplement PRESTIGE WARNING This document is intended to be used by a qualified heating contractor or service technician. Read all instructions within this document and within the PRESTIGE Boiler Installation and Maintenance Manual, before proceeding with the installation. It is recommended to follow the procedures in the steps given, skipping or missing procedural steps can result in substantial property damage, serious injury, or death.
TABLE OF CONTENTS CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS......................................................... 1 1.1. Removal of an Existing Boiler from a Common Vent System................................................ 1 1.2. Vent/Combustion Air Piping and Materials.............................................................................2 1.2.1 PVC and CPVC Vent and Combustion Air Piping and Fittings............................................2 1.2.2 PVC and CPVC Pipe Cement and Primer.....
TABLE OF CONTENTS CHAPTER 3 - CATEGORY IV (INDOOR AIR) INSTALLATION OF VENT/AIR PIPING.....25 3.1. Category IV - Vertical - Through the Roof or Unused Chimney...........................................25 3.1.1 Determine Termination Location........................................................................................25 3.1.2 Category IV - Vent Installation - Through the Roof........................................................... 26 3.1.3 Termination Fittings - Through the Roof...............
PRODUCT AND SAFETY INFORMATION DEFINITIONS INSTALLER The following terms are used throughout this manual to bring attention to the presence of potential hazards or to important information concerning the product. DANGER Indicates the presence of a hazardous situation which, if ignored, will result in substantial property damage, serious injury, or death. WARNING Read all instructions as outlined in this manual and in the boiler installation manual.
Chapter 1 - PRE-INSTALLATION REQUIREMENTS Removal of an Existing Boiler from a Common Vent System DANGER Do not install the PRESTIGE into a common vent with any other gas or oil appliances. This will cause flue gas spillage or appliance malfunction, resulting in substantial property damage, serious injury, or death. When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for proper venting of the remaining appliances.
CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS 1.2. Vent/Combustion Air Piping and Materials CHAPTER 1 NOTICE The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1/ NFPA 54, and/or Natural Gas and Propane Installation Code, CAN/CSA B149.1. The Prestige is certified per ANSI Z21.13 as a Category IV (indoor air) or Direct Vent (sealed combustion) appliance.
CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS • • A specific vent adapter is required to transition from the boiler vent outlet adapter to specific stainless steel vent system. Contact the appropriate AL29-4C® vent manufacturer for transition adapter information. When using stainless steel for the vent system, PVC or CPVC pipe meeting the listed requirements in this manual may be utilized for the combustion air piping.
4 2” (60mm) Wall Plate 2” (60 mm) Wall Strap or Support Clamp 2” (60 mm) Side Wall, 90° Elbow UV Resistant 2” (60 mm) Bird Guard Screen - UV Resistant or End Screen 2” (60 mm) Locking Band Clamp or Connector Ring 2” (60 mm) Side Wall Pipe Lengths - UV Resistant 2PPS-12B (12” or 30cm) or 2PPS-36B (36” or 91cm) 2PPS-LBC IANS02 IAWP02B (black) 22” (60mm)PPS-WPB (black) 2PPS-WSM (galvanized) & 2PPS-WSM-SS (stainless steel) 2PPS-BG IASPP02 IASC02 2PPS-E90B or 2PPS-E90EB ISELL0287UV 2ZDWPB2 2ZDFB
3” (80mm) Wall Plate 3” (80mm) Wall Strap or Support Clamp 3” (80mm) Side Wall, 90° Elbow UV Resistant 3” (80mm) Bird Guard Screen UV Resistant or End Screen 3” (80mm) Locking Band Clamp or Connector Ring 3” (80mm) Side Wall Pipe Lengths UV Resistant 3PPS-12B (12” or 30cm) or 3PPS-36B (36” or 91cm) 3PPS-WPB (black) IAWP03B (black) or IAWP03W (white) 3PPS-LBC IANS03 3PPS-WSM (galvanized) & 3PPS-WSM-SS (stainless steel) 3PPS-BG IASPP03 IASC03 3PPS-E90B or 3PPS-E90EB ISELL0387UV 2ZDWPB3 2ZDFB3
6 ISELL0445UV 4” (110mm*) Side Wall, 45° Elbow Termination - UV Resistant IAWP04B (black) 4PPS-WPB (black) 4PPS-WSM (galvanized) & 4PPS-WSM-SS (stainless steel) 4PPS-LBC IANS04 IASC04 4PPS-BG IASPP04 2ZDWPB4 2ZDFB4 2ZDLC4 2ZDES4 2ZDE487UV 46CWTP or 46CWP (white) 4PPB or 6PPB (for concentric termination) 4PPLC 4PPWG 487PEL 412PPP (12”) or 424PPP(24”) 2ZDP410 (10” or 25cm), 2ZDP420 (20” or 50cm) or 2ZDP440 (40” or 100cm) 4PPS-12B (12” or 30cm) or 4PPS-36B (36” or 91cm) 4PPS-E90B or 4PPS
CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS Description Approved 2” (60 mm) Flex Polypropylene Components Centrotherm Eco Systems, LLC Muelink and Grol B.V./ Dura Vent Z-Flex U.S. Inc.
8 ISAAL0404 4” (110mm*) Appliance Vent Adapter ISBS0487 ISCP04 & IFEP04 IASP04 N/A Included with Base Support *100mm for Muelink and Grol B.V.
CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS • • Vent/Combustion Lengths Air Equivalent 1.4. For all venting applications, PVC/CPVC, AL29-4C®, SS or Polypropylene, the length must not exceed the lengths listed in Table 8 below. For PVC/CPVC or AL29-4C® vent systems, reduce the maximum allowable length for each elbow as follows: 1.4.
CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS CHAPTER 1 1.4.3 Rigid Polypropylene Vent System Restrictions WARNING Contact approved polypropylene vent manufacturer for a copy of their installation instructions. Read, understand and follow all of the vent manufacturer’s instructions before beginning the installation. Contact vent manufacturer if you require any technical support.
CHAPTER 1 - PRE-INSTALLATION REQUIREMENTS Combustion Air Contamination WARNING If the PRESTIGE combustion air inlet is located in an area likely to cause or contain contamination, or if products which could contaminate the air cannot be removed, the combustion air must be repiped and terminated at another location. Contaminated combustion air will damage the unit and its burner system, and can result in substantial property damage, serious injury, or death.
INTENTIONALLY LEFT BLANK
Chapter 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING 2.1. Direct Vent - Vertical - Through the Roof or Unused Chimney NOTICE • The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1/ NFPA 54, and/or Natural Gas and Propane Installation Code, CAN/CSA B149.1.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING Vent Termination CHAPTER 2 12" Min. - 24" Max [30.5 cm to 61 cm] Above Combustion Air Inlet Combustion Air Termination cm] [30.5 . n i M 12" Distance l Radia 12" [30 .5 Above cm] (18” [ 4 the Hig 5.7 cm ] Cana Anticip hest da) ated S now Le vel Fig. 1 - Direct Vent - Vertical Termination of Vent and Combustion Air Piping. d. At least 3 feet [0.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING 1. The vent and combustion air terminations must include a factory supplied “bird screen” installed as shown in Fig. 3 and Fig. 4 on page 16 2. The combustion air piping must terminate in an upside down “U” shape fashion using two 90º elbows as shown in Fig. 1 on page 14. 3. The vent piping must terminate vertically with a coupling as shown in Fig. 1 on page 14. WARNING Do not extend the vent pipe above the roof beyond the dimensions shown in Fig.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING Bird Screen CHAPTER 2 Vent Termination Bird Screen Combustion Air Termination Fig. 3 - Vertical Vent Bird Screen Installation Fig. 4 - Vertical Combustion Air Bird Screen Installation NOTICE The installer must install the factory supplied “bird screens” on the vent and combustion air terminations. Vent Termination Typ. 12" M [30.5 in. - 24” Abov cm - 61 Max. e C cm Air In ombustio] let Ty n p. cm] [30.5 . n i M 12" yp.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING Direct Vent - Horizontal - Sidewall NOTICE • • The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1/ NFPA 54, and/or Natural Gas and Propane Installation Code, CAN/CSA B149.1.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING CHAPTER 2 6. 7. 8. 9. 18 d. Avoid locations where prevailing winds could affect the performance of the boiler or cause recirculation of the flue gases, such as inside corners of buildings, near adjacent buildings, vertical surfaces, window wells, stairwells, alcoves, courtyards, or other recessed areas. e. Do not terminate the vent above doors or windows, flue condensate could freeze causing ice formations. f.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING 0.5 cm] 12" Min.[3 y Horizontal Air to t n e V from 12” Min .-2 [ 30.5 c 4” Max. mFrom W 61 cm] all To Ve nt . 12" Min . Typ ] m c .5 [30 1" [2.5 From W cm] all T of Coup o Edge ling - Air in. m] M est 0.5 c h 12" [3 rade / Hig evel eG wL Abov ated Sno ip Antic Combustion Air Termination . 12" Min ] [30.5 cm 1" [2.5 From W cm] all T of Coup o Edge ling - Air 12" Min .-2 [30.5 - 4” Max. From W 61 cm] all to V ent CHAPTER 2 12" Min - 24” Max.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING Vent Termination Combustion Air Termination Bird Screen CHAPTER 2 Bird Screen Fig. 9 - Sidewall Vent Bird Screen Installation Fig. 10 - Sidewall Combustion Air Bird Screen Installation NOTICE NOTICE The installer must install the factory-supplied “bird screens” on the vent and combustion air terminations. • Fig. 11 on page 21 shows one option for vent and combustion air terminations of multiple PRESTIGE boilers.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING Vent Terminations 0.5 cm] 12" Min. [3 een etw B Horizontally ns tio a All Termin 1" From [2.5 cm] Wa of Co ll To Edge upling Typ. Air CHAPTER 2 cm] Min. 12" [30.5 Max. m] 24" [ 61 c .5 cm] 12" [30 e ov Min. Ab hest ig Grade/H d te a ip Antic p. evel, Ty Snow L 12” Min. - 24 [ 30.5 cm ” Max. From Wa 61 cm] l To Ven t Typ. Combustion Air Terminations Fig. 11 - Direct Vent - Sidewall Termination of Multiple Prestige Boilers 1 (18” [ 2" [30.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING 2.3. Direct Vent - Vertical Vent and Sidewall Combustion Air NOTICE • CHAPTER 2 • The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1/ NFPA 54, and/or Natural Gas and Propane Installation Code, CAN/CSA B149.1.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING 6. 7. 8. 2.3.2 Direct Vent - Vent Installation - Through the Roof 1. Vent pipe penetration through combustible or non-combustible wall material must maintain a minimum 1/4” [6 mm] clearance for 3” and 4” PVC/ CPVC vent or 1” [2.5 cm] for 2” PVC/CPVC vent. The diameter of the penetration hole must be 4” [10.2 cm] minimum for 2” and 3” pipe or 5” [12.7 cm] minimum for 4” pipe.
CHAPTER 2 - DIRECT VENT INSTALLATION OF VENT/AIR PIPING 2.3.4 Termination Fittings - Vertical & Sidewall CHAPTER 2 1. The vent and combustion air terminations must include a factory supplied “bird screen” installed as shown in Fig. 3 on page 16 & Fig. 10 on page 20. 2. The combustion air piping must terminate using a 90º elbow as shown in Fig. 6 or Fig. 8 on page 19. 3. The vent piping must terminate vertically with a coupling, as shown in Fig. 12 on page 21.
Chapter 3 - CATEGORY IV (INDOOR AIR) INSTALLATION OF VENT/AIR PIPING A Category IV appliance utilizes uncontaminated indoor or outdoor air (surrounding the appliance) for combustion. 3.1.1 Determine Termination Location 3.1. 1. The total length of the vent piping must not exceed the limits given in Table 8 on page 9. 2. The combustion air piping must terminate at the boiler with a 90º elbow. 3.
CHAPTER 3 - CATEGORY IV (INDOOR AIR) INSTALLATION OF VENT/AIR PIPING CHAPTER 3 e. Do not terminate the vent above doors or windows, flue condensate could freeze causing ice formations. f. Locate the vent termination to prevent possible condensate damage to exterior finishes. g. Avoid locations of possible accidental contact of flue vapors with people or pets. 5. The vent termination must also maintain the following clearances; as shown in Fig. 15 below. a. At least 3 feet [0.9 m] from adjacent walls b.
CHAPTER 3 - CATEGORY IV (INDOOR AIR) INSTALLATION OF VENT/AIR PIPING 1. On installations of multiple PRESTIGE boilers, terminate each vent pipe as described in this manual. 2. Each vent termination must be a minimum 12” [30.5 cm] from the adjacent termination for installations in the U.S. as shown in Fig. 16 below. For installations in Canada, provide clearances as required by CAN/CSA B149.1. in. 12" M m] c [30.5 1 (18” 2" [30.5 [45 cm Abo .
CHAPTER 3 - CATEGORY IV (INDOOR AIR) INSTALLATION OF VENT/AIR PIPING 28 g. A minimum 12 inches [30.5 cm] horizontal spacing from other fan assisted appliance vents. Never terminate the vent above or below any fan assisted vent within 12 inches [30.5 cm] horizontally. 6. Locate the vent termination in a manner to protect from damage by foreign objects, such as stones, balls, or buildup of leaves or sediment. 7. Do not connect any other appliance to the vent pipe or multiple boilers to a common vent pipe.
CHAPTER 3 - CATEGORY IV (INDOOR AIR) INSTALLATION OF VENT/AIR PIPING 1. Vent pipe penetration through combustible or non-combustible wall material must maintain a minimum 1/4” [6 mm] clearance for 3” and 4” PVC/ CPVC vent or 1” [2.5 cm] for 2” PVC/CPVC vent. The diameter of the penetration hole must be 4” [10.2 cm] minimum for 2” and 3” pipe or 5” [12.7 cm] minimum for 4” pipe. When using Polypropylene or Stainless Steel Vent, refer to the vent manufacturer’s Installation Instructions for clearances. 2.
INTENTIONALLY LEFT BLANK
Chapter 4 - INSTALLATION REQUIREMENTS 4.1. Vent/Combustion Air Transitions 4.1.1 3” to 2” (60 mm) Transitions 2 Inch Vent Pipe PVC or CPVC Material NOTICE 1. The transition from 3” vent system to 2” (60 mm) vent system must occur at the boiler vent outlet. 2. The transition from 3” vent to 2” (60 mm) vent must occur in a vertical run only. WARNING Transition of 3” vent to 2” (60 mm) vent in a horizontal run will result in pooling of the condensate and potential vent blockage.
CHAPTER 4 - INSTALLATION REQUIREMENTS 4.1.2 3” to 4” (100 mm) Transitions NOTICE 4.2. 1. The installer must clean, deburr and chamfer the pipe ends prior to assembly. WARNING This Chapter outlines the installation of 4” (100 mm) Venting and Combustion Air piping for all PRESTIGE Solo models and the EXCELLENCE when the vent system must transition from the 3” outlet of the boiler to the 4” (100 mm) vent system. 1. The transition from 3” vent system to 4” (100 mm) vent system must occur within 5 feet [1.
CHAPTER 4 - INSTALLATION REQUIREMENTS Vent and Combustion Air Piping Installation 4.3.1 PVC/CPVC Vent System 1. The installer should install the vent / combustion air piping working from the boiler to the piping termination. The piping length must not exceed the lengths listed in Table 8 on page 9. 2. The installer should cut the pipe to the required length and must deburr the inside and outside of both ends. 3.
CHAPTER 4 - INSTALLATION REQUIREMENTS 4.4. Carbon Monoxide Detector Installation ACV-Triangle Tube requires the installation of a minimum of two (2) hard wired carbon monoxide detectors with an alarm and battery back-up in the mechanical room where the Prestige is located and another installed in the living area outside the bedroom(s) for all installations. Each carbon monoxide detector shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
Chapter 5 - MANIFOLD COMBUSTION AIR Manifold Combustion Air Option for Multiple Prestige Boilers 1. Common combustion air manifold is restricted to horizontal/side wall terminations only. 2. The number of Prestige boilers connected to a common combustion air manifold system is limited by the combined maximum boiler input shown in Table 9. 3. The combustion air manifold must be constructed of round solid core PVC pipe with minimum diameter based on combined maximum boiler input. See Table 9 below.
CHAPTER 5 - MANIFOLD COMBUSTION AIR 5.4. • Use perforated metal strap hangers or equivalent pipe hangers suitable for plastic pipe to support the common combustion air manifold. Hangers must be placed at a maximum of every 5 ft [1.5 m] of horizontal and vertical run of piping. A support must be placed at every boiler and at every vertical or horizontal change in direction. Do not penetrate any part of the piping with a fastener. 5.5.
Chapter 6 - COMMONWEALTH OF MASSACHUSETTS INSTALLATION REQUIREMENTS 6.1. Installation of Carbon Monoxide Detectors. 1. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. 2.
CHAPTER 6 - COMMONWEALTH OF MASSACHUSETTS INSTALLATION REQUIREMENTS 6.4. Inspection. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4. 6.4.1 Exemptions The following equipment is exempt from 248 CMR 5.08(2)(a) 1 through 4: 1.
39
40
41
42
43
Additional quality water heating equipment available from ACV - Triangle Tube SMART INDIRECT FIRED WATER HEATERS 1. 2. 3. 4. 5. 6. Exclusive Tank-in-Tank design Stainless steel construction Available in 7 sizes Limited LIFETIME residential warranty 6 Year limited commercial warranty Self cleaning/self descaling design TTP BRAZED PLATE HEAT EXCHANGERS 1. For domestic water, snow melting, radiant floor. 2. Plates made of stainless steel, with 99.9 % copper brazing, ensuring a high resistance to corrosion 3.