Prestige Solo 399 Concentric Vent System Supplement

5
Vent/Air System Joint Assembly
1. When installing the vent system, the female end
of the pipe or fitting should face up or away
from the boiler.
2. Prior to assembly of any piping or fittings
inspect and ensure the inner pipe gasket seal is
present, undamaged and properly seated in the
groove of the pipe.
3. Insert and rotate the male end of the inner pipe
into the female end of the previous pipe section.
It is recommend to moisten the gasket seal with
clean water prior to assembly.
To aid in the assembly of the pipes and fit-
tings use only clean water to moisten the gas-
ket and the mating end of the pipe. Use a
twisting motion as the pipe ends are pressed
together.
4. Push the sections together firmly until the outer
jacket bead of the new section has made contact
with the edge of the female end of the previous
section. When fully assembled, the outer
female end of the previous section will overlap
the male end by approximately 1”.
5. Use 2 self-drilling screws provided to secure the
outer sections together where they overlap.
Install screws 90ΒΊ apart from one another. No
pre-drilling is required.
NOTICE
Vent/Air System Installation
4. Horizontal or vertical runs of the vent/air sys-
tem must be supported at every joint. The
installer should use the Hanging Clamp, PSV-
CLP01 or perforated metal strap hangers or
equivalent to support the piping
.
5. The vent/air system must terminate using the
horizontal termination supplied in the kit.
6. The vent/air system must be pitched back to the
boiler at minimum 5/8 inch per foot on any hor-
izontal runs.
Boiler Vent /Air System Adapter
Install boiler vent/air system adapter over the boiler
vent and air outlets. Secure the vent/air system
adapter using the band clamps found on the vent
and air adapters of the boiler.
Ensure Vent/Air System Adapter is properly
oriented over the boiler adapters. The concen-
tric outlet of the adapter should be installed
toward the top left side of the boiler.
NOTICE
9 1/2”
Face of Wall
12”
Min.
Grade/Anticipated
Snow Line
Air Intake
Fig. 5: Installation Requirements
Vent/Air Adapter
Boiler Vent
Outlet Adapter
Adapter Band Clamps
Boiler Air
Inlet Adapter
Fig. 6: Assembly of Vent/Air Adapter