User's Manual

SkyPilot SkyAccess DualBand Installation 36
The primary grounding point of the AC electrical system of the
building.
A 10-foot or longer copper-clad ground rod driven into the earth. For
a tower with multiple legs, you need one ground rod per leg and a
ground wire loop connecting each of the rods; see Figure 12.
Figure A1-1. Attaching the SkyConnector
Making Connections “Gas-Tight”
Regardless of the grounding point you use, make sure the connections
are “gas-tight” - capable of retaining low resistance and integrity over
time and with exposure to the elements.