Installation Sheet

A818
1
TRINITY BAMBOO
INSTALLATION & MAINTENANCE GUIDELINES FOR SOLID
STRAND BAMBOO FLOORING
NOTE: READ ALL OF THE FOLLOWING GUIDELINES BEFORE INSTALLATION
If you have any questions, please call Trinity Bamboo @ 1-888-248-6538 for Support
Important Notes:
You have purchased a Trinity Bamboo Premium Solid Strand Bamboo Flooring Product. This FloorScore® Certified
Solid Strand Bamboo Flooring with a Tongue and Groove milling profile is suitable for a Glue-Down installation
onto a wood or concrete subfloor or a Nail-Down installation onto a wooden subfloor. This product may be
installed on or above grade (on, or above ground level). This product is suitable for installation over radiant heating
systems if installed via NWFA guidelines via the nail-down method. Please check Trinitybamboo.com for the latest
updates to these Installation Guidelines (this is version A818). Prior to installation, please ensure that you have
read Trinity Bamboo’s warranty.
Disclaimer: Trinity Bamboo, LLC has provided this information “as is” without warranties of any kind, expressed or
implied. Trinity Bamboo has made every reasonable effort to ensure the accuracy of the information and is not
responsible for errors and/or omissions. All information is provided as a courtesy to our customers and is meant to
be understood as an installation guideline only. The customer and/or the installer is solely responsible for any and
all decisions regarding how, where, and when to install any Trinity Bamboo product. It is the sole responsibility of
the installer and the property owner to determine if the job site’s sub-floor and environmental conditions are
suitable for the installation of Trinity Bamboo flooring and accessories. Trinity Bamboo makes no warranty or
guarantee of the quality of the chosen installer’s work or of a particular installation performed by the installer.
Trinity Bamboo disclaims all liability for any errors or improprieties in the installation of its products. Other than
for those conditions specifically detailed in Trinity Bamboo’s warranty, installation of any Trinity Bamboo product
serves as unconditional acceptance of that material.
This flooring product is suitable for installation onto an above-grade or on-grade subfloor (above ground
level or at ground level). This flooring is NOT suitable for below-grade (below ground level) installations.
Do not deliver or install flooring until the building has been enclosed with windows and doors, and all
cement, plastering, and other “wet” work has been completed.
Flooring must be delivered to the job site a minimum of 72 hours prior to installation to enable it to
acclimate to site conditions. If the relative humidity in the installation environment is outside of the
35% to 55% range, acclimation will take approximately 1 week per percent change in desired moisture
content (for example, acclimation to adjust the flooring’s moisture content from 8.5% to a moisture
content of 11.5% may take 3 weeks or longer). Carefully read the “Acclimation” section below.
Handle and unload flooring with care. Store in a dry place with at least a four-inch air space under cartons.
Do not store boxes on uncovered concrete or other cementitious materials.