Installation Manual

Table Of Contents
28 GHz Fast Ethernet IFU Installation (9/17/99) - R0.1 2-1
CONFIDENTIAL & PROPRIETARY
D
O
N
O
T
C
O
P
Y
2
Staging Procedure
This chapter describes the IFU configuration procedure to be performed at the
designated staging area.
Configuring IFUs
IFUs are configured by using the IFU Link Manager to load the site-specific
attributes from the attributes table in the site engineering folder. Table 2-1
identifies the parts needed for configuring a typical IFU site.
Table 2-1. Typical IFU Configuration Parts List
Item
No.
Description Qty.
1IFU 1
2 BNC to banana plug adapter 1
3 IFU Link Manager test cable 1
4 Laptop computer with IFU Link Manager installed 1
5 Power source ( 48 Vdc) 1
6 IFU power cable 1
7 Site engineering folder 1
8 Digital multimeter 1