Installation Manual

Table Of Contents
Installation Procedures
3-2 © 1999 Triton Network Systems, Inc. All Rights Reserved.
CONFIDENTIAL & PROPRIETARY
D
O
N
O
T
C
O
P
Y
Setup
Before Starting
Before starting the procedures in this chapter, verify that all parts have been
received by checking the received items against the equipment and parts lists
in the site engineering folder.
Preparing for Installation
Table 3-1 identifies the special tools required for installation and Table 3-2
identifies the parts required.
Table 3-1. Site Installation Tools
Item
No.
Description Qty.
1 Digital multimeter 1
2 Fiber cleaning kit (solution & air) 1
3 Fiber scope 1
4 Fiber tester transmitter 1
5 Fiber tester receiver 1
6 Fiber test adapter 2
7 Site engineering folder 1
8 Right-angled snap ring pliers (for external snap ring) 1
Table 3-2. Site Installation Parts (for two IFUs)
Item
No.
Description Qty.
1IFU 2
2 IFU mounting bracket with snap ring kit 2
3 IFU power cable 2
4 IFU alarm cable (if specified) 2
5 Fiber optic cable 2
6 Tie-wraps, UV-rated A/R