Installing Power Cables
There are two cable routes as follows:
n
The IFU Alpha power cable runs from the IFU mounting location to
the surge suppression assembly.
n
The IFU Beta power cable runs from the IFU mounting location to
the surge suppression assembly.
To install the IFU power cables:
1 Route the IFU power cables to a surge suppression assembly according to
the site drawing.
NOTE: Allow an extra three-foot service loop at the IFU and
twelve inches at each surge suppressor. Use large radius
bends to avoid kinking the cables during the cable routing.
NOTE: Connect the cable shields to the suppressor
mounting panel. Trim the shield back to the cable breakout
and keep the shield as short as possible.
2 Trim each cable to the appropriate length.
3 Strip each cable wire to 3/8 inch and tin.
4 Attach the IFU power cables to the surge suppressors as shown on
Figure 3-3, Figure 3-4, and Table 3-3.
DANGER HIGH VOLTAGE HAZARD: Do not work
on the system or connect or disconnect cables during
periods of lightning activity, rainy weather, or both.
DANGER LHASARD DU TENSION ÉLEVÉ : Ne
pas travailler sur le système ni brancher ni débrancher les
câbles durant lactivité de la foudre, par de temps
pluvieux, ou tous le deux.
CAUTION: Instructions for installing cables are intended
for licensed contractors or building maintenance
personnel.
MISE EN GARDE : Les instructions pour linstallation
des câbles sont destinées exclusivement aux entrepreneurs
agréés et aux préposés à lentretien de limmeuble.