Installation Manual

Table Of Contents
Alignment Procedures
4-2 © 1999 Triton Network Systems, Inc. All Rights Reserved.
Setup
Before Starting
Before starting the procedures in this chapter, ensure that the IFUs have been
mounted at the near-end site and far-end site, and that the cables have been
tested.
Preparing for Installation
Table 4-1 identifies the basic aligning tools required for aligning the near-end
and far-end sites.
Table 4-1. Site Commissioning Tools
Item
No.
Description Qty.
1 IFU Link Manager test cable 2
2 IFU Link Manager software 2
3 Hub (10BaseT) 1
4 Laptop computer with IFU Link Manager and
SmartApplications™ software installed
2
5 100BaseT to 100BaseFX media converters 2
6 10BaseT cable (CAT-5) 4
7 SC-to-SC couplers 2
8 MT-RJ to SC fiber adapters (MT-RJ SC) 2
9 Digital multimeter (measures DC voltage up to 100V,
accuracy, 0.3% or better)
2
10 BNC-banana interface cable 1
11 Site engineering folder 1
12 9/16 in. wrenches or sockets 2
13 Optical alignment tool 1