Installation Instructions

Site Evaluation
© 2001 Triton Network Systems, Inc. All Rights Reserved. 1-13
From Table 1-3, R
·
= .001 /ft
From Table 1-4, R
o
= .15
w = 1 pair
t
Cu
= 1.0039
30
mv/°C
Therefore:
d
i
= [(2.6-.15)/2(.001)] * (1/1.0039
30
)
d
i
= (2.45)/.002) * (1.0039
-30
)
d
i
= 1090 feet
(d
i
= 332 m)
1.4.13 Confirm Presence of AC Power
Ensure AC power will be available to provide power to the power supply and all other electrical
supplies. AC power is required within 15 feet (4.5 meters) of the site equipment location.
1.4.14 Take Site Photographs
Take photographs of the following:
IFU mounting location for each IFU
View of the other buildings in the link from the IFU mounting location
Site equipment mounting location
360 degree views from the installation site
1.4.15 Sketch the Site
Sketch the installation location of all site equipment and cable routes. Providers can use these
sketches to produce the architectural and engineering drawings, which are blueprints for the
installers. Recommended sketches include the following:
Site equipment location, including the indoor AC power source
Mounting locations of IFUs (wall or pole mount)
All cable routing
NOTE: A NEMA L5-15R, 15A twist-lock receptacle outlet is recommended.
d
i
2.6 R
o
2 R×′
--------------------
w
t
Cu
---------
×
=