FT5000 - SITE PREPARATION AND INSTALLATION GUIDE
INTRODUCTION
This document contains the information necessary for the preparation and
installation of a FT5000 Triton ATM. It’s important that the site complies with the
requirements specified in this document. In addition, electrical wiring and
mechanical systems must also comply with all relevant laws and regulations.
The site must be prepared by the customer or his agent who is fully conversant
with the requirements of installing through-the-wall ATM equipment. The
responsibility for ensuring that the site is prepared in compliance with this
document remains with the customer.
For information and guidance only, a list is provided in general terms of those
matters for which the customer is responsible. The list is not intended to be
comprehensive and in no way modifies, alters, or limits the responsibility of the
customer for all aspects of adequate site preparation.
1. Location of the equipment and site preparation.
2. Site wiring (power, communication).
3. Location of other equipment that may cause electrical, electromagnetic, or
heat induced interference.
4. Make building alterations to meet wiring and other site requirements.
5. Install all communication cables, wall jacks, and associated hardware.
6. Provide and install necessary power distribution boxes, conduits and
grounds.
7. Ensure all applicable codes, regulations and laws (electrical, building, safety)
are adhered to.
8. Ensure the environmental requirements of this unit are met.
9. Install the unit at a height which meets the ADA accessibility regulations
for the state/country installed.