35-8050-3 2X4 CORNHOLE SET WITH INTEGRATED CADDY INSTRUCTION MANUAL PLEASE KEEP THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE If you have any concerns with your product please visit our website www.escaladesports.com for fastest service. Please have a copy of your receipt of purchase. For any technical support or warranty issues please contact Escalade Sports at 1-800-467-1421 or e-mail us at customerservice@escaladesports.
Limited 90-Day Escalade Sports Warranty All Escalade Sports games have a limited 90-day from date of purchase warranty. This warrants the retail purchaser for any Escalade Sports game purchased to be free from any defect in materials and construction for 90 days from the date of purchase. The only exceptions to the warranty include main frames, tabletops, playing surfaces, batteries or tools.
Parts List 1 2 Board Assembly Qty. 4 Qty. 2 4 5 Bean Bag- Blue Bean Bag- Red Qty. 4 Qty. 4 7 Screw Knob Magnetic Score Indicator 8 Magnetic Score Indicator Qty. 2 Qty.
Setup Instructions - Separating the Boards 1. The Boards will come attached together with velcro strips. On a dry and clean surface place the Boards (#1) on their sides and separate. See Figure 1. 1 1 Figure 1.
Setup Instructions - Unfolding Metal U-legs 2. While holding the Board (#1) on its side with one hand, pivot the Metal U-legs 1 out until the wooden legs are fully extended. See Figure 2. Figure 2. Figure 3. 3. Keep on pivoting the Metal U-Leg, until it is in the position shown in Figure 3.
Setup Instructions - Installing the Screw HingesKnobs 4. Carefully set board on its legs as shown in Figure 4. 5. Insert the Screw Knobs into the holes in the end of the board and turn a few times to get them started. See Detail A. 6. Pivot Metal U-Leg and Hinges towards the back of the Board until they reach the Knobs. A Rotate the hinges until they slide onto the screw section of the knobs. See Detail B. Figure 4.
Setup Instructions - Installing Hinges 7. Tighten knobs until the Hinges are secure. Ensure knobs are completely tight. See Figure 5 & Detail A. A Figure 5.
Setup Instructions - Installing the Batteries 8. Install the batteries in the battery compartment while the tray is folded. See Figure 6. 9. Remove the phillips screw and take cover off. Then insert four AA batteries into the battery compartment. See Detail A & Detail B. Figure 6. A Screw Cover AA AA + AA AA + See Detail C. + screw. Then slide the switch to the ON position. + 10.
Setup Instructions - Opening Tray 11. While holding on to the metal U-Leg, pivot the tray up until you hear that it locks in place. See Figure 7 & Detail A. Congratulations you are now ready to play! A Figure 7.
Playing Instructions FOUL LINE FOUL LINE PLAYER 1 / TEAM 1 PLAYER 2 / TEAM 1 27 ’ (8,22 m) PLAYER 1 / TEAM 2 PLAYER 2 / TEAM 2 GAME SETUP: 1. Playing Area – Select an open area that provides approximately 27 ft. (approx. 11 paces apart) between the two foul lines (front of the Bean Bag Boards). Allow children to set the distance with their own stride. The width of the court depends on the skill level of the players. 2. Play is between two players or teams.
Game play - Keeping Score 1. Use the Magnetic Score Indicators to keep score by attaching on the score numbers on the Metal U-Leg. See Figure 1. 8 7 Figure 1.
Storage Instructions - Folding the Tray 1. To release tray press on the spring loaded slotted hinge to release the tray and let the tray slowly slide down until you hear it lock. See Detail A & Detail B.
Storage Instructions - Detaching the Hinges 2. Loosen the knobs about three quarters of the way and detach the Hinges. See Figure 1. Figure 1. 3. Carefully turn the board on its side and start folding the Metal U-legs towards the underside of the board. See Figure 2. Figure 2.
Storage Instructions - Folding Metal U-legs 4. Keep on folding the metal U-Legs until they are flush with the underside of the A board. See Figure 3 & Detail A. NOTE: You will hear when the metal U-Legs make contact with the magnets on the underside of the board. Magnet Figure 3.
Storage Instructions - Storing Accessories 5. Magnetic Score Indicators (#7,#8) can be stored by placing them on the end of the Metal U-Leg as shown in Detail A. NOTE: Make sure magnetic Score Indicators are out of the way so they do not touch when attaching the second board assembly. A 6. For convenience the Screw Knobs (#2) can be kept screwed in place at the end of the board. Ensure that they are tightened and secure. See Detail B. 7.
Storage Instructions - Attaching the Boards 9. Line up and place Boards as shown until the Velcro strips hold the boards together. See Figure 5 & Detail A. NOTE: Game can be played outdoors but Velcro must be stored indoors in a dry place. A Figure 5.