Operating Guide

12 SECTION 2 — ASSEMBLY & SET-UP
7. Push chute control rod toward control
panel until hole in rod lines up with hole
in chute control input closest to chute
control head and insert hairpin clip (a)
removed in Step 1. See Figure 2-31.
(a)
Figure 2-31
NOTE:
Second hole is used to achieve
further engagement of chute control
rod into pinion gear if required. Refer to
Service section for Chute Control Rod
adjustments.
8. Finish securing chute control head to
chute support bracket with wing nut (b),
clevis pin (d), and bow-tie cotter pin (e)
removed in Step 1.
9. Check that all cables are properly routed
through cable guide on top of engine.
See Figure 2-32.
Figure 2-32
NOTE:
For smoothest operation, cables
should all be to the left of the chute
directional control rod.
NOTE: Models with 2-Way Chute
Control have only one cable to route
through cable guide.
STOP
STOP! Continue to Set-Up (page
14).
Overhead Chute Control (w/ Flex Shaft & Steel Chute)
Figure 2-33
1. Remove lock nuts (a) and hex screws (b)
from chute support bracket (this will
require two wrenches). See Figure 2-34.
Chute
Assembly
Chute Base
Chute
Support
Bracket
Chute
Control Head
(a)
(a)
(b)
(b)
Figure 2-34
2. Place chute assembly onto chute base
and chute control head onto chute
support bracket. See Figure 2-34.
3. Secure chute control head to chute
support bracket with lock nuts (a) and
hex screws (b) removed in Step 1.
See Figure 2-35.
(a)
(a)
(b)
(b)
Figure 2-35
4. Remove hairpin clip (a) from rear of
chute control assembly. See Figure 2-36.
(a)
(b)
Figure 2-36