Spec Series Manual

STR•STA
•STG
TABLE OF CONTENTS
Safety Information
Safety Precautions _________________________ 1
Proper Disposal ___________________________ 2
Adapter Plugs ____________________________ 2
Connecting Electricity ______________________ 3
Installation / Operation Instructions
Ownership _______________________________ 3
Required Tools / Recommended Tools _________ 3
Unpackaging _____________________________ 4
Wire Size Chart ___________________________ 5
Locating & Installation of Leg/Castors __________ 6
Leveling & Sealing Cabinet To Floor ___________ 7
Electrical Instructions _______________________ 8
Start-up _________________________________ 9
Electronic Temp Control Operations ________ 10-16
Pilaster and Shelf Installation ________________ 17
Pilaster Configuration and Installation _________ 18
Door Operation __________________________ 19
Maintenance, Care & Cleaning
Cleaning Condenser Coil _________________ 20-21
Stainless Steel Equipment Care & Cleaning _____ 22-23
Warranty (U.S.A. & Canada Only!) _____________ 24
NOTICE TO
CUSTOMER:
Loss or spoilage of products in your
refrigerator/freezer/heated cabinet
is NOT covered
by warranty.
In addition to
following recommended installation
procedures you must run the
refrigerator/freezer/heated cabinet
24 hours prior to usage.
TRANSPORTING THIS CABINET WITHOUT THE PROPER DOOR BLOCKS WILL RESULT IN
DAMAGE TO DOORS OR IMPROPER DOOR OPERATION.
DO NOT UNBLOCK DOORS UNTIL COOLER IS SPECIFICALLY
LOCATED IN ITS FINAL LOCATION.
TO ENSURE PROPER DOOR OPERATION, CASTORS OR LEGS MUST BE
INSTALLED AND THE CABINET MUST BE LEVELED FROM FRONT
TO BACK AND LEFT TO RIGHT.