Operation Manual

10
Trouble-shooting list
Fault Cause Rectification
Not heating up. No operating
voltage.
Restore power
supply.
Taking an ex-
tremely long time
to heat up in
230 V operation
Heating element
furred.
Descale water
system (see
maintenance).
If these measures do not remove the failure, please contact
the Truma Service Centre.
Technical data
determined in accordance with Truma test conditions
Water content
5 litres
Operating pressure
max. 1.2 bar (only use pump without non-return valve)
Power supply
230 V ~, 50 Hz
Power consumption
1.3 A (300 W)
Thermal cut-out
65 °C
Over-temperature protection
85 °C
Heating time from approx. 15 °C to approx. 60 °C
approx. 50 minutes
Weight (without contents)
2 kg complete with drain and venting valves
Dimensions
length 37 cm, height 23 cm, width 22 cm
Conformity Declaration
The Therme complies with the requirements of EN 60335,
EMC directive 89/336/EEC, low voltage directive 73/23/EEC
and the associated standards and technical specifications, and
is therefore entitled to bear the CE symbol.
The right to effect technical modifications is reserved!