User's Manual
Table Of Contents
- Front Cover
- Contents
- List of Figures
- List of Tables
- List of Code Listings
- Legal Disclaimer
- Regulatory Information
- Typographic Conventions
- Important Notice
- Hardware Setup
- 1 Introduction
- 2 Overview of the TTE-Switch Lab Space
- 3 Functional Description
- 4 Getting Started
- 5 State Machine
- 6 Configuring the TTE-Switch Lab Space
- 7 Diagnosis
- 8 Troubleshooting
- Appendix A Default Configuration
- Appendix B MIBs
- Glossary
- Bibliography
- Index
HARDWARE SETUP
Hardware Setup
Required Hardware
Several components are needed to get the TTE-Switch Lab Space installed in a rack. The following list
shows which of these components are included with the switch and which are not.
• Screws and fasteners for rack mounting – tbd
• Ethernet cables – not included
Installation Instructions
Compatible Hardware
© TTTech Computertechnik AG 2019. All rights reserved.
Confidential and Proprietary Information
11
Document Number:
D-863-M-05-001