Pre-Delivery/Install Checklist

Your Tu Shed building is about to become a reality.
Important details for installation day:
Our installers will arrive on the site, unload materials and
components, and begin to assemble your building.
Please have someone over the age of 18 at home.
An out of level site will force our installers to stop work and
collect an additional leveling fee prior to resuming.
Our installers will need a power source so they can plug in
the compressors that power their tools.
Inspect the building before the installers leave for the day.
It may surprise you – but like most home builders, the
weather seldom interferes with installation. Rain, snow, and
sleet will most likely not prevent installation. Ask for details.
You’ve decided on the building style, size and design,
and nalized your purchase. Important prep work
remains for you and for us, including:
• Youwillbecontacted within 24-48 hours to schedule your
installation.
• BuildingPermit(s)/HOARequirements – Customers need
to conrm with their HOA and/or municipality for appropriate
building permit requirements. Contact us immediately if you
need help.
• PreparetheJobSite – Clean the site of all debris (i.e. old
tree stumps, trash, dog waste, etc) and level the site. If the
site is more than 4” out of level, a charge will apply.
Keep your Building on the Level – When normal ground settling occurs, it can aect your Tu Shed building,
making it dicult to open, close or latch the door. This is not a warranty issue, but in most cases, the building can
be easily re-leveled by the customer or for a reasonable fee by Tu Shed.
Redirect Water – Water is the enemy of most structures. Take care to redirect water from your building whenever
possible. Rain water runo from other structures and misdirected irrigation systems can damage your Tu Shed
building, and is not covered by warranty.
Re-paint Regularly – Painting is one of the easiest ways to protect the exterior wood surfaces of a Tu Shed
building. Your building’s warranty coverage requires that the building be re-painted every ve years. We
recommend using high quality materials like PPG Paints.
Do not add rubber mats or vinyl ooring inside as they can create a serious moisture and rot issue.
PRE-INSTALLATION PROCESS
PROPER CARE & MAINTENANCE
INSTALLATION DAY
Building components pre-fabricated
and ready for delivery
Building components being carried
into place for on-site installation
WHAT TO EXPECT
TAHOE SERIES SHEDS

Summary of content (2 pages)