Installation Guide

4
4
3
Gate Installation:
The opening between the posts should be 1
1
1
1
2
2
" wider
than the gate width to allow for hinges. (Example: Use
a 48" opening for a 46
1
1
1
2
2
" wide gate.) Be sure posts are
level and plumb.
Fig. 4
Example:Example:
Frost Line
Gravel/
Filler
6"
6"
X+Y
Y
X
Fig. 5
Fig. 6
Post
Concrete
Gravel/Filler
Post Location:
Measure the width of the fence panel (X) plus the width
of the post (Y). This is the common center-to-center
measurement (unless there is a cut-down panel) for post
hole location (Fig. 4).
Post Installation:
Dig the  rst two post holes. Hole size should be dug based
on the following determination: Depth is determined by
your local frost line measurements plus 6" for gravel/ ller
(Fig. 5). Width is 6"
Insert 6" of gravel/ ller into the bottom of both holes and
then set both posts into the ground and level the  rst post.
Add wet or dry concrete mix according to manufacturer’s
instructions to the top of the  rst post hole. Make sure your
post remains level with 3
1
1
1
2
2
" more than panel height above
ground (Fig. 6).
After setting  rst fence section, proceed systematically
with post, panel, post, etc.