Instructions / Assembly

3
Fig. 3
Gravel
Concrete
Post
Measure center-to-center distance of posts and
install accordingly (Fig. 1). Proceed systematically
with post, panel, post, etc.
Dig  rst two post holes 8" in diameter and down
to your speci ed frost line. Insert  ller/gravel into the
bottom of both holes and then set  rst post in post
holes.
Add wet or dry concrete mix according to the
manufacturer’s instruction to the top of the hole for
rst post Ensure  rst post is plumb and level. Let
concrete soft set making sure panel will be 2" above
ground (Fig. 2 & 3).
Repeat this process for second post hole. Be sure to
assemble panel before concrete in second hole dries.
In-Ground Post Installation Option:
Post Installation Options:
• In-Ground Post Installation
• Surface Mount on Concrete Installation
• Surface Mount on Wood/Composite Deck Installation
Example:Example:
Frost Line
Gravel/
Filler
8"
Fig. 2
2"
Center-To-Center Post
Center-To-Center Post
Distance
Distance
8"
Fig. 1
1