Instructions / Assembly

4
Assemble Fence (Vertical Board Installation):
a. First, pre-install the rail adaptor (trim channel)
into the top, bottom, and both sides of the
mid-rail (Fig. 4). May need to use a rubber
mallet to completely set the trim channel in
place.
b. On  rst post insert the rail into the post channel
and line up the holes of bottom rail and bottom
of post. Make sure the open pocket in the rail
is facing up (Fig. 5). Insert pin (from post kit).
c. On second post, insert the opposite end of the
bottom rail into place, align holes, and insert pin.
d. Begin inserting boards, starting on the outside
of both posts working your way towards the
center (Fig. 6).
e. Insert mid-rail over bottom boards, making
sure it nests completely over the boards
f. Install next set of composite boards inside of
mid-rail (top of fence panel) (Fig. 7).
g. Line up holes in top rail and top of post and
insert rail into the post channel. Make sure
the open pocket in the rail is facing down.
Insert pin. Repeat for opposite side (Fig. 8).
h. Snap post cover (from post kit) into place by
holding cover approximately 6" from top of
post. Hook one side of the cover and push
down to snap the other side. Slide the cover
down the post to hide the pins (Fig. 9). Repeat
for other post.
i. Install post cap (from post kit) to top of post.
Use a soft rubber mallet, if necessary to obtain
a  rm  t (Fig. 10). Repeat for other post.
NOTE:
“Top” and “Bottom” rails are the same.
Fig. 5
Fig. 4
Fig. 8
Fig. 9
Fig. 10
Hook
Hook
Hook &
Hook &
Snap Snap
Post Cover
Post Cover
Post
Channel
– Top Rail
– Mid Rail
– Bottom Rail
– Rail Adaptor
– Rail Adaptor
– Rail Adaptor
– Rail Adaptor
Open Pocket
Fig. 7
Fig. 6
2a