Owners Manual
ManualsBrandsTurbo Air ManualsCommercial EquipmentPRO-26-2H2-G-PT-RL 29" Pro Series Front Right and Back Left Hinged Glass Half Door Pass-Thru Heated Cabinet with 26.2 cu. ft. Capacity, Digital Temperature Control & Monitor System, Ducted Fan Air Distribution System and LED Lighting in Stainless Steel -
11
INSTALLATION
• Roll‐In Cabinets placed on the ground require flat and level ground to be set. Also,
to comply with National Sanitation Foundation standards, sealant should be applied
around the perimeter of the models’ base.
• Wear safe gloves when carrying the ramps to prevent possible injuries.
Step 1
Place the frontal flange of the Ramp between the Support Ramp and Support Ramp (B).
If the flange gets placed behind the Support Ramp, the door will not close.
Step 2
Center the ramp respect to the Roll‐In Cabinet. Then the installation process is
completed.
Ramp Installation For Roll‐In Models
RAMP
SUPPORT
RAMP
SUPPORT
RAMP (B)
RAMP
Frontal
Flange