Rigging Manual

48 MANCHESTER SERIES Rigging Manual
8. 2 Attaching MS215 subwoofers to the MS215-VT
2
1
5
3
5
1
4
4
4
4
2
2
2
1. Prepare the rst MS215 subwoofer, by pulling out the 4 lower rigging
pins (1).
2. Carefully lift the MS215 subwoofer until its mounting slots t over the 4
mounting links (2) of the MS215-VT. Reinsert the pins (1) to secure the
subwoofer cabinet to the mounting links (2).
Take care not to trap your ngers between components.
Double check that all pins are correctly inserted,
before proceeding further.
3. Other MS215 subwoofers can be added on top of the rst subwoofer, using
the same procedure as shown in the section on ground stacking.
4. When the last subwoofer has been added, the top lid of the MS215-VT can be
added as follows, to protect the subwoofers.
5. Prepare the top MS215 subwoofer by pulling out the 4 upper rigging pins
(3). The spring-loaded top links (4) will move to the up position. Reinsert the
pins (3) to secure the links (4) in the up position.
6. Pull out the 4 rigging pins (5) from the top lid of the MS215-VT.
7. Lower the top lid onto the top of the upper MS215 subwoofer and carefully
align it so the mounting positions in the top lid t over the MS215 top links
(4).
8. Reinsert the pins (5) to secure the top lid to the subwoofer.
Double check that all pins are correctly inserted.
! WARNING
DO NOT EXCEED A TOTAL QUANTITY OF 3 MS215 SUBWOOFERS FOR EACH
MV212-VT. FAILURE TO FOLLOW INSTRUCTIONS MAY CAUSE PERMANENT INJURY
OR DEATH.