Rigging Manual

Rigging Manual 19
Chapter 3: Assembling a TBV123 Array on a TBV123-FB Flybar
3.0.1 Required Components
Item Quantity
TBV123-FB Flybar 1
TBV123 Cabinet 4 (maximum)
3.0.2 Preparation
Use the EASE FOCUS II software application to design your system to suit
the venue. This will calculate which ybar mounting hole to attach your
bow shackle.
3.0.3 Location
Move the rst TBV123 cabinet so it is sitting upright on a safe at surface, directly
below the suspension point.
3.0.4 Measured Weights
Please see Section 2.3 Weights on Page 9, and refer to EASE Focus Rigging
Parameters when designing your system.
TBV123-FB Flybar Working Load Limit (WLL)
Item Working Load Limit (WLL)
TBV123-FB 100 kg 220.5 lbs
The following procedure shows how to build an array of TBV123 cabinets by
adding them one at a time, up to a maximum of 4.
Alternatively, the cabinets can be pre-assembled into a group of 4,
and then connected to the ybar at a later time.
The system is own using a TBV123-FB ybar that attaches to your
lifting system.
The top TBV123 cabinet connects to two mounting points on the ybar.
Each TBV123 cabinet connects to the cabinet above using the integral
mounting points and rigging pins. No tools are required.
WARNING
DO NOT EXCEED A TOTAL QUANTITY OF 4 TBV123 CABINETS FOR 1 TBV123-FB
FLYBAR. FAILURE TO FOLLOW INSTRUCTIONS MAY CAUSE PERMANENT INJURY
OR DEATH.
3.0.5 Personnel
The following procedures shall be undertaken by experienced, certied,
qualied, and authorised personnel only. The procedures require the use of three
or more authorised persons.
Protective Headwear shall be worn
Protective Footwear shall be worn
Protective Gloves shall be worn
Protective Eyewear shall be worn
Practice Safe Lifting