Installation Guide

______________________________________________________________________________________
Turf
Evolutions, LLC 100 Executive Way phone 866-966-TURF
Suite 108 fax 904-827-9426
info@turfevolutions.com Ponte Vedra Beach, FL 32082 www.turfevolutions.com
Turf Evolutions Putting Greens Installation Process
Below you will find an abbreviated installation process for our TruLine Bentgrass putting
greens. Our greens have a true roll, and will hold a shot giving the player a very natural
response.
Base Construction
1. Remove the organic topsoil with skid steer or sod cutter and take off site.
2. At the depth of compactable soil, make sure
the base is sloped to drain any water that may
protrude into base cavity. Soils should be
either crowned or sloped in one direction, then
compacted with roller.
3. Depending on surroundings, a drain tile may
be needed on low side of green to take water
away from cavity. In this case, dig trench
large enough to lay in clean drain stone, 4”
perforated drain tile, and cover with another layer of clean stone.
4. Add and shape layer of ¾’- crushed stone within 2” of the height of surrounding
grass, then compact with roller to 95%.
5. Add and shape 2” of stone dust to make final
grade. The final grade should be a smooth
and compacted as possible with undulations,
crown or slope that was shaped in step 2.
6. When compacting base you may have to keep
material dampened to maximize compaction.
**Base requirements may be less depending
on region of the country. If solid sub grade in arid climate, may only need 2” on
compacted fines/screenings.

Summary of content (4 pages)